Tilt-Up Panel Inspection & Test Plan
ITP for tilt-up concrete panel construction covering casting bed preparation, panel reinforcement, lifting hardware, tilt sequence planning and temporary bracing per AS 3850.
13 checklist items
4 hold points
2 witness points
Checklist Preview
Casting Bed Preparation
Requires sign-offP/F
Casting slab surface smooth and levelP/F
Bond breaker uniformly appliedP/F
Edge forms set to panel dimensionsP/F
Opening blockouts positioned per drawingsPanel Reinforcement & Embedments
Requires sign-offP/F
Reinforcement placement per structural drawings Hold Witness
P/F
Lifting inserts positioned per engineer design Hold
P/F
Bracing insert positions verifiedP/F
Connection hardware cast-in per detailsTilt & Erection
Requires sign-offP/F
Minimum concrete strength achieved for tilt Hold Witness
P/F
Crane capacity verified for panel weightP/F
Temporary bracing installed immediately Hold
P/F
Panel plumb and alignment verified✓
Brace removal criteria documentedPrefer AI?
Generate a custom Concrete ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free