DemolitionCommercial
Façade Removal & Strip-Out Inspection & Test Plan
ITP for building façade removal covering hazardous material checks, scaffolding requirements, panel removal sequence, crane operations, pedestrian protection and façade retention systems.
12 checklist items
2 hold points
1 witness points
Checklist Preview
Pre-Removal Checks
Requires sign-offP/F
Hazardous materials survey for cladding system Hold
P/F
Structural assessment for removal sequenceP/F
Scaffold or EWP access in placeP/F
Pedestrian protection hoarding installedP/F
Drop zone barricaded and managedRemoval Process
Requires sign-offP/F
Removal sequence per approved method statementP/F
Panel fixings cut or unbolted methodicallyP/F
Panels lowered by crane (not dropped) Hold Witness
P/F
Temporary weatherproofing applied to exposed areasCompletion
Requires sign-offP/F
Retained structure inspected for damageP/F
Façade materials segregated for recyclingP/F
Working area made safe and securePrefer AI?
Generate a custom Demolition ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free