All templates
ElectricalCommercial

Earthing & Lightning Protection Inspection & Test Plan

ITP for building earthing systems and lightning protection covering earth electrode installation, bonding conductors, earth resistance testing and lightning rod placement per AS/NZS 3000 and AS 1768.

12 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Earth Electrode System

Requires sign-off
P/F
Electrode type and burial depth per design
#
Earth resistance (Ω)
Hold
P/F
Electrode connections exothermically welded
Photo
P/F
Ring earth continuity verified

Bonding Conductors

Requires sign-off
P/F
Main earth bar connections verified
Hold Witness
P/F
Structural steel bonding complete
P/F
Water pipe bonding connected
P/F
Bonding conductor sizing per AS/NZS 3000

Lightning Protection

Requires sign-off
P/F
Air terminal placement per risk assessment
P/F
Down conductor routing and fixings compliant
P/F
Test joints accessible and labelled
P/F
SPD coordination across zones

Prefer AI?

Generate a custom Electrical ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free