All templates
ElectricalCommercial

Fire Detection & Alarm System Inspection & Test Plan

Inspection and test plan for fire detection and alarm systems covering detector placement, sounder circuits, MCP positioning, zone wiring and end-of-line monitoring per AS 1670.1.

14 checklist items
3 hold points
3 witness points
Use this template — it's free

Checklist Preview

Detector Installation

Requires sign-off
P/F
Detector spacing per AS 1670.1
P/F
Detector mounting height compliant
P/F
Detector types match design for each zone
Witness
P/F
Beam detector alignment verified
P/F
Duct detectors coordinated with HVAC

Wiring & Circuits

Requires sign-off
P/F
Fire-rated cable used where specified
Hold
P/F
End-of-line devices installed per zone
P/F
Fire circuits isolated from other services
P/F
Loop resistance within manufacturer limits

Panel & Commissioning

Requires sign-off
P/F
Fire indicator panel programmed per cause-effect
Hold Witness
P/F
All sounders audible throughout building
Witness
P/F
Manual call points tested and operational
P/F
Fire brigade connection verified
Hold
Zone plan affixed adjacent to FIP

Prefer AI?

Generate a custom Electrical ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free