Penetration Sealing
Requires sign-offP/F
Penetration schedule documented and currentP/F
Sealant system has valid test report Hold
P/F
Seals installed per tested configurationPhoto
P/F
Fire collars installed on plastic pipesP/F
Annular gaps filled per test reportFire-Rated Walls & Ceilings
Requires sign-offP/F
Wall system matches tested configuration Hold
P/F
Head-of-wall joint per fire-rated detailP/F
Ceiling fire barrier continuity maintainedP/F
Penetration labels affixedDampers & Barriers
Requires sign-offP/F
Fire dampers at rated boundary penetrations Hold Witness
P/F
Access panels provided for damper maintenanceP/F
Cavity barriers installed per specification✓
Passive fire register completedReady to use this template?