GlazingCommercial
Glass Balustrade Inspection & Test Plan
ITP for frameless and semi-frameless glass balustrade systems covering glass specification, spigot or channel installation, structural adequacy and compliance with AS 1170 loading requirements.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Fixing System
Requires sign-offP/F
Spigot/channel type per structural designP/F
Fixing spacing per engineer specificationP/F
Core drill depth and anchor set correct Hold
P/F
Base plates or channels set levelGlass Installation
Requires sign-offP/F
Toughened/laminated glass per AS 1288 Hold
P/F
Glass thickness per structural designP/F
Glass panels plumb and correctly seatedP/F
Gap between panels per specificationHandrail & Testing
Requires sign-offP/F
Handrail fixed and continuousP/F
Handrail height per NCC (min 1000mm)P/F
Proof load test satisfactory per AS 1170 Hold Witness
P/F
Non-climbable per NCC requirementsPrefer AI?
Generate a custom Glazing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free