GlazingCommercial
Fire-Rated Glazing Inspection & Test Plan
ITP for fire-rated glazing systems covering frame and glass FRL verification, intumescent seal installation, framing fixing, labelling and compliance with AS 1530.4 tested configurations.
12 checklist items
3 hold points
1 witness points
Checklist Preview
Frame Installation
Requires sign-offP/F
Frame system matches AS 1530.4 test report Hold
P/F
Frame fixing method per tested configurationP/F
Frame-to-wall gap sealed per tested detailP/F
Intumescent strips installed per configurationFire-Rated Glass
Requires sign-offP/F
Glass FRL matches wall/partition FRL requirement Hold
P/F
Fire-rated marking etched on glassP/F
Glazing beads per tested configurationP/F
Panel size within tested maximum dimensionsCompliance & Documentation
Requires sign-offP/F
Fire test report provided and reviewed Hold Witness
P/F
Certificate of conformity from manufacturerP/F
Fire door label affixed (if operable)✓
Entry added to passive fire protection registerReady to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free