All templates
GlazingCommercial

Fire-Rated Glazing Inspection & Test Plan

ITP for fire-rated glazing systems covering frame and glass FRL verification, intumescent seal installation, framing fixing, labelling and compliance with AS 1530.4 tested configurations.

12 checklist items
3 hold points
1 witness points
Use this template — it's free

Checklist Preview

Frame Installation

Requires sign-off
P/F
Frame system matches AS 1530.4 test report
Hold
P/F
Frame fixing method per tested configuration
P/F
Frame-to-wall gap sealed per tested detail
P/F
Intumescent strips installed per configuration

Fire-Rated Glass

Requires sign-off
P/F
Glass FRL matches wall/partition FRL requirement
Hold
P/F
Fire-rated marking etched on glass
P/F
Glazing beads per tested configuration
P/F
Panel size within tested maximum dimensions

Compliance & Documentation

Requires sign-off
P/F
Fire test report provided and reviewed
Hold Witness
P/F
Certificate of conformity from manufacturer
P/F
Fire door label affixed (if operable)
Entry added to passive fire protection register

Prefer AI?

Generate a custom Glazing ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free