All templates
HVACCommercial

Chiller Plant Installation Inspection & Test Plan

ITP for chiller plant and associated systems covering equipment positioning, piping connections, electrical supply, vibration isolation, refrigerant charge and performance testing.

14 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Equipment Positioning

Requires sign-off
P/F
Chiller positioned per mechanical drawings
P/F
Structural support and pads adequate
P/F
Vibration isolators installed and levelled
P/F
Tube pull and maintenance clearances provided

Piping & Electrical

Requires sign-off
P/F
Chilled water piping connected and flushed
P/F
Condenser water piping connected
P/F
Flexible connections at chiller inlet/outlet
P/F
Electrical supply per chiller nameplate
Hold
P/F
VSD configured per manufacturer settings

Commissioning

Requires sign-off
P/F
Refrigerant charge verified
P/F
Oil charge level per manufacturer spec
P/F
Performance test at design conditions
Hold Witness
P/F
All safety cutouts tested and verified
P/F
BMS integration and alarm points verified

Ready to use this template?

Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.

Get started free