HVAC Controls & BMS Inspection & Test Plan
ITP for building management system and HVAC controls covering sensor installation, controller programming, point-to-point verification, sequence of operations testing and trend logging.
13 checklist items
2 hold points
1 witness points
Checklist Preview
Sensor Installation
Requires sign-offP/F
Sensor locations per mechanical drawingsP/F
Sensors calibrated within specified accuracyP/F
Duct sensor insertion depth correctP/F
Outdoor sensors shielded from direct sunController & Wiring
Requires sign-offP/F
Controllers mounted and poweredP/F
Point-to-point verification complete Hold Witness
P/F
BACnet/Modbus network communication verifiedP/F
I/O point count matches scheduleProgramming & Commissioning
Requires sign-offP/F
Sequence of operations tested and verified Hold
P/F
Temperature and pressure setpoints per designP/F
Alarms configured and testedP/F
Trend logging established for key parametersP/F
BMS graphical interface operationalReady to use this template?