PlumbingCommercial
Fire Hydrant & Hose Reel Plumbing Inspection & Test Plan
ITP for fire hydrant and hose reel pipework installation covering pipe materials, supports, hydrostatic testing, valve installation and flow testing per AS 2419.1.
11 checklist items
3 hold points
2 witness points
Checklist Preview
Pipework Installation
Requires sign-offP/F
Pipe material per AS 2419.1P/F
Pipe supports and seismic bracing installedP/F
Isolation valves at specified locationsP/F
Fire-rated penetration sealing complete HoldPhoto
Hydrostatic Testing
Requires sign-offP/F
Hydrostatic test at 1400kPa for 2 hours Hold Witness
P/F
No leaks observed during testAa
Test certificate referenceFlow Testing & Commissioning
Requires sign-offP/F
Hydrant flow rate meets design requirement Hold Witness
P/F
Hose reels fully operationalP/F
Brigade booster connection accessible✓
Block plan installed at hydrant boosterPrefer AI?
Generate a custom Plumbing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free