PlumbingCommercial
Sanitary Fixture Fit-Off Inspection & Test Plan
Second-fix plumbing ITP for sanitary fixture installation covering WCs, basins, showers, urinals, disabled fixtures, tapware commissioning and watermark compliance.
13 checklist items
2 hold points
1 witness points
Checklist Preview
Fixture Installation
Requires sign-offP/F
All fixtures WaterMark certified Hold
P/F
WC installation secure and levelP/F
Basin mounting height and fixing secureP/F
Shower base graded to wasteP/F
Urinal flush mechanism operationalAccessible Fixtures
Requires sign-offP/F
Disabled WC seat height 460-480mmP/F
Grabrail positions per AS 1428.1 Witness
P/F
Lever-action tapware installedP/F
Accessible basin rim height ≤ 840mmCommissioning
Requires sign-offP/F
Flow rates per WELS ratingP/F
Hot on left, cold on right verifiedP/F
All wastes draining freelyP/F
No leaks at joints and connections Hold
Prefer AI?
Generate a custom Plumbing ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free