All templates
Structural SteelCommercial

Structural Steel Fire Protection Coating Inspection & Test Plan

ITP for intumescent and cementitious fire protection coatings on structural steel including surface preparation, application, DFT measurement and adhesion testing per AS 1530.4.

14 checklist items
3 hold points
2 witness points
Use this template — it's free

Checklist Preview

Surface Preparation

Requires sign-off
P/F
Surface cleanliness to specified standard
P/F
Primer compatible with fire protection system
Hold
P/F
Primer DFT within manufacturer range
P/F
Surface moisture content acceptable

Application

Requires sign-off
P/F
Product batch numbers recorded
P/F
Temperature and humidity within application range
P/F
Application method per manufacturer datasheet
P/F
Maximum thickness per pass maintained
P/F
Overcoat interval within specified window

DFT Inspection

Requires sign-off
P/F
Wet film thickness checked during application
Witness
P/F
Dry film thickness per FRL schedule
Hold Witness
#
Average DFT reading (μm)
P/F
Adhesion pull-off test satisfactory
Fire engineer sign-off obtained
Hold

Ready to use this template?

Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.

Get started free