TilingResidential
Swimming Pool Tiling Inspection & Test Plan
ITP for swimming pool and spa tiling covering shell preparation, waterproofing membrane, tile adhesive for submerged conditions, grout selection, expansion joints and slip resistance per AS 3958.1.
13 checklist items
3 hold points
1 witness points
Checklist Preview
Shell Preparation
Requires sign-offP/F
Pool shell concrete fully cured (min 28 days) Hold
P/F
Surface profile suitable for tile adhesionP/F
Pool shell waterproofing applied and curedP/F
Hydrostatic relief provisions verifiedTiling Installation
Requires sign-offP/F
Adhesive rated for permanent submersion (C2TE) Hold
P/F
Tile type and slip rating per pool specificationP/F
100% adhesive bed coverage on all tilesP/F
Waterline tile alignment level and consistent Witness
P/F
Step and ledge nosing tiles installedGrouting & Completion
Requires sign-offP/F
Epoxy grout used for pool applicationP/F
Expansion joints at wall/floor junctionP/F
Tiles around fittings neatly cut and sealedP/F
Pool filled and monitored for leaks (48hrs) Hold
Prefer AI?
Generate a custom Tiling ITP in seconds
Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.
Free AI ITP Generator →Ready to use this template?
Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.
Get started free