TilingResidential
Tiling Substrate Preparation Inspection & Test Plan
ITP for substrate preparation prior to tiling covering levelness, moisture testing, screed verification, waterproofing coordination and primer application per AS 3958.1.
11 checklist items
2 hold points
1 witness points
Checklist Preview
Substrate Verification
Requires sign-offP/F
Substrate type suitable for tiling methodP/F
Flatness within 3mm in 3m (or per spec) Hold
P/F
Substrate moisture content within limitsP/F
Screed fully cured (minimum 28 days cement)Waterproofing Coordination
Requires sign-offP/F
Waterproofing membrane cured and tested Hold
P/F
Membrane undamaged prior to tilingP/F
Puddle flanges clamped and sealedPrimer & Preparation
P/F
Primer type compatible with adhesive systemP/F
Primer applied to full coverageP/F
Falls to waste outlets verifiedP/F
Tile layout set-out approved Witness
Ready to use this template?
Sign up for free, import this ITP template into your project, and start inspecting. Your first project is always free.
Get started free