All templates
TilingResidential

Tiling Substrate Preparation Inspection & Test Plan

ITP for substrate preparation prior to tiling covering levelness, moisture testing, screed verification, waterproofing coordination and primer application per AS 3958.1.

11 checklist items
2 hold points
1 witness points
Use this template — it's free

Checklist Preview

Substrate Verification

Requires sign-off
P/F
Substrate type suitable for tiling method
P/F
Flatness within 3mm in 3m (or per spec)
Hold
P/F
Substrate moisture content within limits
P/F
Screed fully cured (minimum 28 days cement)

Waterproofing Coordination

Requires sign-off
P/F
Waterproofing membrane cured and tested
Hold
P/F
Membrane undamaged prior to tiling
P/F
Puddle flanges clamped and sealed

Primer & Preparation

P/F
Primer type compatible with adhesive system
P/F
Primer applied to full coverage
P/F
Falls to waste outlets verified
P/F
Tile layout set-out approved
Witness

Prefer AI?

Generate a custom Tiling ITP in seconds

Describe your scope and our AI builds a complete ITP with hold points, witness points, and sign-off roles — tailored to your project.

Free AI ITP Generator →

Ready to use this template?

Sign up, import this ITP template into your project, and start inspecting. 14 days free — no credit card required.

Get started free