Construction & trades

AI-powered · Free to try · Save your ITP

Free Demolition ITP Generator

Generate a complete Inspection and Test Plan for demolition work in seconds. Soft strip, structural demolition, hazmat controls, and clearance. Hold points and witness points are placed automatically, edit, brand, and sign off when you're ready.

  • Demolition-specific hold points and witness points
  • Aligned with relevant Australian Standards
  • Sign up free to download your PDF
  • Save to your workspace and use on every project
Trade
Scope
Brand
Project
Finish

What trade is this ITP for?

We'll build a practical starter checklist for your trade, you can edit anything after.

Used on live Australian projects

DynafixTreu Construct
Read their stories

Background

What is a Demolition ITP?

A demolition ITP is a structured quality assurance document that defines every inspection and test required during demolition works, who checks what, when work must stop for sign-off, and what evidence is recorded.

Most demolition ITPs are built around the moments where work becomes hard or expensive to undo. For this scope that usually means hazmat clearance before demolition, structural sequence approval and final site clearance sign-off, each one a hold point that pauses the job until it's signed off. Witness points like services isolation, dust and vibration monitoring, and waste tracking tell the superintendent or client when to attend, without holding up the crew if they can't make it.

Reference standards matter here: AS 2601: Demolition, WHS demolition code and EPA waste requirements are the documents a superintendent or certifier will expect to see cited. A demolition ITP that names the requirement behind each check is much harder to argue with months later.

Quality checkpoints

Demolition ITP Hold Points & Witness Points

The AI generator automatically includes these checkpoints based on your scope description. Hold points require mandatory sign-off before work proceeds; witness points notify the relevant party but don't stop work.

Hold Points

Work stops until signed off

  • Hazmat clearance before demolition
  • Structural sequence approval
  • Final site clearance sign-off

Witness Points

Party notified, work can continue

  • Services isolation
  • Dust and vibration monitoring
  • Waste tracking
  • Adjacent property protection

Applicable Australian Standards

  • AS 2601: Demolition
  • WHS demolition code
  • EPA waste requirements

Audit-grade evidence

GPS & weather captured at every demolition sign-off.

Generating a demolition ITP gets you a checklist. Defending it years later in a defect claim is a different problem. HoldPoint records the inspector's GPS coordinates and the live weather (temperature, humidity, wind, and sky condition), at the moment they sign each hold point. The data prints on the final PDF under the signature.

Temperature on record

Pour temp, ambient, and curing window, automatically logged.

Humidity & wind

Critical for paint, coating, and curing claims under AS standards.

Lat / lng + map link

Proof the inspector was actually on site, not signing from the office.

Available on every paid HoldPoint plan. The free generator gives you the ITP: HoldPoint gives you the defensible record.

Common questions

Demolition ITP: Frequently Asked Questions

Do I need an ITP for demolition work in Australia?
If your contract, principal contractor, or client QA manual calls for an Inspection and Test Plan, you need one, whether or not your scope is "construction" in the everyday sense. On commercial and government projects, demolition work is typically assessed against AS 2601: Demolition, WHS demolition code and EPA waste requirements, and the ITP is how you show each requirement was actually verified.
What hold points should a Demolition ITP include?
At minimum: hazmat clearance before demolition, structural sequence approval and final site clearance sign-off. Hold points belong wherever a defect would be concealed by following work or expensive to put right, so work stops until the nominated party signs. Your specification or the principal's QA plan may add more.
Which standards apply to demolition inspections?
The references most demolition ITPs cite are AS 2601: Demolition, WHS demolition code and EPA waste requirements. Always check the project specification as well, it frequently calls up extra requirements, or a specific edition, on top of the standard.
Can I use an AI-generated demolition ITP on a real project?
Yes, as a starting point. Generate the demolition ITP for your scope, then review it against your contract and specification, especially the hold points, like hazmat clearance before demolition. Run it through HoldPoint for digital sign-offs, photos, and branded PDFs, and have your QA manager or superintendent approve the final version before it goes to site.

Need to manage ITPs across a live project?

The free generator builds a single ITP. HoldPoint gives you the full workflow, templates, digital sign-offs, photo attachments, audit trails, and automatic PDF generation for every document on every project.

14 days free. No credit card to start.