Construction & trades

AI-powered · Free to try · Save your ITP

Free Glazing & Facade ITP Generator

Generate a complete Inspection and Test Plan for glazing & facade work in seconds. Curtain wall, windows, structural glazing, and weatherproofing hold points. Hold points and witness points are placed automatically, edit, brand, and sign off when you're ready.

  • Glazing & Facade-specific hold points and witness points
  • Aligned with relevant Australian Standards
  • Sign up free to download your PDF
  • Save to your workspace and use on every project
Trade
Scope
Brand
Project
Finish

What trade is this ITP for?

We'll build a practical starter checklist for your trade, you can edit anything after.

Used on live Australian projects

DynafixTreu Construct
Read their stories

Background

What is a Glazing & Facade ITP?

A glazing & facade ITP is a structured quality assurance document that defines every inspection and test required during glazing & facade works, who checks what, when work must stop for sign-off, and what evidence is recorded.

On a glazing & facade job the plan turns on a handful of mandatory stops: subframe alignment inspection, structural glazing cure verification and water penetration test (if specified). Each of those is a hold point: work doesn't move past it until the nominated party has inspected and signed. Witness points like sealant application, glass type verification and operable window tests tell the superintendent or client when to attend, without holding up the crew if they can't make it.

An Australian glazing & facade ITP is normally written against AS 1288 (Glass in buildings, AS 2047) Windows and doors, and NCC weatherproofing. Naming the standard you're inspecting to, rather than a generic "inspect and approve" line, is what makes the record hold up in an audit, a defect claim, or a payment dispute.

Quality checkpoints

Glazing & Facade ITP Hold Points & Witness Points

The AI generator automatically includes these checkpoints based on your scope description. Hold points require mandatory sign-off before work proceeds; witness points notify the relevant party but don't stop work.

Hold Points

Work stops until signed off

  • Subframe alignment inspection
  • Structural glazing cure verification
  • Water penetration test (if specified)

Witness Points

Party notified, work can continue

  • Sealant application
  • Glass type verification
  • Operable window tests
  • Protection prior to handover

Applicable Australian Standards

  • AS 1288 (Glass in buildings
  • AS 2047) Windows and doors
  • NCC weatherproofing

Audit-grade evidence

GPS & weather captured at every glazing & facade sign-off.

Generating a glazing & facade ITP gets you a checklist. Defending it years later in a defect claim is a different problem. HoldPoint records the inspector's GPS coordinates and the live weather (temperature, humidity, wind, and sky condition), at the moment they sign each hold point. The data prints on the final PDF under the signature.

Temperature on record

Pour temp, ambient, and curing window, automatically logged.

Humidity & wind

Critical for paint, coating, and curing claims under AS standards.

Lat / lng + map link

Proof the inspector was actually on site, not signing from the office.

Available on every paid HoldPoint plan. The free generator gives you the ITP: HoldPoint gives you the defensible record.

Common questions

Glazing & Facade ITP: Frequently Asked Questions

Do I need an ITP for glazing & facade work in Australia?
If your contract, principal contractor, or client QA manual calls for an Inspection and Test Plan, you need one, whether or not your scope is "construction" in the everyday sense. On commercial and government projects, glazing & facade work is typically assessed against AS 1288 (Glass in buildings, AS 2047) Windows and doors, and NCC weatherproofing, and the ITP is how you show each requirement was actually verified.
What hold points should a Glazing & Facade ITP include?
At minimum: subframe alignment inspection, structural glazing cure verification and water penetration test (if specified). Hold points belong wherever a defect would be concealed by following work or expensive to put right, so work stops until the nominated party signs. Your specification or the principal's QA plan may add more.
Which standards apply to glazing & facade inspections?
The references most glazing & facade ITPs cite are AS 1288 (Glass in buildings, AS 2047) Windows and doors, and NCC weatherproofing. Always check the project specification as well, it frequently calls up extra requirements, or a specific edition, on top of the standard.
Can I use an AI-generated glazing & facade ITP on a real project?
Yes, as a starting point. Generate the glazing & facade ITP for your scope, then review it against your contract and specification, especially the hold points, like subframe alignment inspection. Run it through HoldPoint for digital sign-offs, photos, and branded PDFs, and have your QA manager or superintendent approve the final version before it goes to site.

Need to manage ITPs across a live project?

The free generator builds a single ITP. HoldPoint gives you the full workflow, templates, digital sign-offs, photo attachments, audit trails, and automatic PDF generation for every document on every project.

14 days free. No credit card to start.